搜索结果: 1-8 共查到“核科学技术 steam”相关记录8条 . 查询时间(0.203 秒)

The prediction of steam explosion inducing loads in nuclear power plants must be based on results of experimental research programmes and on simulations using validated fuel-coolant interaction codes....
GASFLOW Validation with Panda Tests from the OECD SETH Benchmark Covering Steam/Air and Steam/Helium/Air Mixtures
Steam/Air Steam/Helium/Air Mixtures OECD SETH Benchmark
2009/9/2
The CFD code GASFLOW solves the time-dependent compressible Navier-Stokes Equations with multiple gas species. GASFLOW was developed for nonnuclear and nuclear applications. The major nuclear applicat...
秦山三期核岛工程土建和安装施工质量监理(The Quality Supervision of Civil Work and Erection Construction For Qinshan Phase III Nuclear Steam Plant)
秦山三期 施工质量监理 核岛
2008/11/17
对核工业四达建设监理公司承担的秦山三期核岛工程(NSP)土建和安装施工质量监理进行了全面总结,重点介绍了4年多监理实践中探索出的富有特色的改进质量监理的方法和手段。
秦山三期核岛工程的质量趋势分析(The Quality Tendency Analysis of Qinshan Phase III Nuclear Steam Plant Project )
秦山三期 质量指标 质量状况 趋势分析
2008/11/13
根据在秦山三期核岛工程核蒸汽厂(NSP)土建与安装工程的质量监理工作,对质量趋势分析这一方法作一概括的总结和介绍。
秦山三期工程728MW汽轮机设备及安装特点(The 728MW Steam Turbine Plants and Installation Characteristics for Qinshan Phase III CANDU Project )
秦山三期 汽轮机 安装 坎杜
2008/10/29
简要介绍了秦山三期项目中日立公司生产的728 MW汽轮机本体设备特点,现场安装特点及新工艺,通过有效的实施,保证了汽轮机的安装质量。
百万千瓦级压水堆核电厂蒸汽发生器国产化能力分析(Domestic Design and Manufacture Capability Assessment Of 1 000 MW PWR Steam Generator )
压水堆 蒸汽发生器 国产化
2008/10/22
蒸汽发生器是压水堆核电厂的关键设备。经过数十年的努力,我国目前已基本掌握百万千瓦级压水堆核电厂蒸汽发生器关键设计技术,具备了设计和制造能力,可以满足新建核电厂蒸汽发生器国产化的要求。本文论述了我国百万千瓦级压水堆核电厂蒸汽发生器研发需要掌握的关键技术,现有的蒸汽发生器自主设计和制造能力,并对蒸汽发生器国产化比率作出估计。
根据国外压水堆核电站蒸汽发生器的运行经验,结合我国核电站蒸汽发生器的情况,介绍了蒸汽发生器在运行中的事故与故障,并提出了相应对策。