搜索结果: 1-8 共查到“水文学及水资源 Final Report”相关记录8条 . 查询时间(0.062 秒)
Arroyo Colorado Agricultural Nonpoint Source Assessment Final Report
Arroyo Colorado Agricultural Nonpoint Source Assessment Final Report
2013/9/10
As a result of low dissolved oxygen levels, the tidal segment of the Arroyo Colorado (Segment 2201), does not currently meet the aquatic life use designated by the State of Texas and described in the ...
Irrigation District Database Analysis Cameron County Irrigation District No. 2 Final Report
Irrigation District Database Analysis Cameron County Irrigation District No. 2 Final Report
2013/9/10
Irrigation District Database Analysis Cameron County Irrigation District No. 2 Final Report.
Public Service Announcements for the Arroyo Colorado Watershed Final Report
Public Service Announcements Arroyo Colorado Watershed Final Report
2013/9/10
Public Service Announcements for the Arroyo Colorado Watershed Final Report.
Runoff of Escherichia coli (E. coli) and other fecal indicator bacteria from grazing lands has been identified as a significant source of bacterial contamination in need of reductions to improve water...
North Central Texas Water Quality Final Report
North Central Texas Water Quality Final Report
2013/9/10
Tarrant Regional Water District (TRWD) is one of the largest raw water suppliers in Texas, serving about 1.6 million people in ten counties including Fort Worth and the surrounding area. With growing ...
Site Suitability Assessment for Irrigating Urban Landscapes with Water of Elevated Salinity in the Southwest Consolidated Final Report Part I. Water Quality and Plant Salt Tolerance
Site Suitability Assessment Irrigating Urban Landscapes with Water Elevated Salinity Southwest Consolidated Final Report Part I. Water Quality Plant Salt Tolerance
2013/9/10
With increasing population and the demand for potable water, water with elevated salinity and reclaimed water are now commonly used for irrigating urban landscape in many communities in the arid South...
Bosque River Environmental Infrastructure Improvement Plan: Phase I Final Report
Bosque River Environmental Infrastructure Improvement Plan Phase I BMP Modeling Report
2013/9/10
The Bosque River and its associated watershed face a myriad of water quality challenges. Previous attempts made to address these concerns have met with limited success due to a relatively narrow, spec...
Assessment of Stormflow and Water Quality from Undisturbed and Site Prepared Forest Land in East Texas (Final Report)
Stormflow Water Quality Undisturbed Site Prepared Forest Land East Texas
2013/9/11
In 1979, nine small forested watersheds were instrumented in East Texas to determine the effect of intensive forest management practices
On water quantity and quality. Three replications of three tre...