搜索结果: 1-2 共查到“水文测量 Improvements”相关记录2条 . 查询时间(0.125 秒)
Operational Spring Time Forecasting Difficulties and Improvements
Operational Time Forecasting Difficulties Improvements
2009/10/27
A modified version of HBV-3 model has been used since 1981 for operational
spring-time forecasting in Finland. This model is ready now for eleven river
basins ranging from 500 to 30,000 km2. From th...
Model performance before and after the introduction of some alternative routines
for calculation of evaporation, snow accumulation and melt with the
PULSEIHBV runoff model were compared. The results...